e-Leave HRM Location-Based Mobile App Attendance System
For a company with a large number of field employees or with multiple sites and offices, it is important to have a system that can track the movement of your employees for attendance purposes. BizCloud is now equipped with GPS location capability. This functionality allows the system to record the GPS coordinates of your employees together with a timestamp at any given time and location. With this in place, your employees will no longer need to call in to confirm their location, instead, they can do so on their mobile device, and with a simple click of a button. The attendance will be logged into the system with time and coordinates that can be a review later on.
- Captures employee’s GPS location
- Real-Time Attendance viewed in e-Leave HRM portal
- iOS & Android App available
- Compatible with Tablet
- Quick setup and cost-saving
- No technical knowledge required
- No additional hardware required
- Free constant module updates
Mobile Time Attendance System with Geo-location Tracking Capability

With the help of the GPS, BizCloud will be able to record not only the time when your employee logs in but also the coordinates of their current position.

This new system will allow your employees to punch in their attendance using any GPS-enabled devices at any location as long as internet service and GPS signals are available.

Time and location data will be recorded into the system in real-time, and are accessible on-demand from any browsers.
GPS Tracking Attendance Mobile App System Features